BackQuote 0413-26 — version 2
Summit Lift & Rigging, Inc. — Built to Lift
Quote
Quote #: 0413-26
(916)-555-0100LIC. #SLR-0417
Ironwood Bridge & Concrete
52 Mill Street
Harlan Flat, CA 95948
Date: August 4, 2026
Quote Number: 0413-26
Version: 2
Job Name: Clear Fork crossing - set (6) pre-cast box culvert sections.
Job Location: Clear Fork crossing at County Rd B-7
Harlan Flat
CA 95948
USA
Job Date: August 13, 2026
Customer Rep Name/Title: Hector Salas, Foreman
Email: hsalas@ironwoodbridge.example
Cell Phone: 916-555-0166
Scope of Work:

Supply operated and maintained 110t class crane with counterweight transport to set six (6) pre-cast box culvert sections at 16,500 lbs each. Sections to be delivered and staged by others within crane radius.

Project is a DIR prevailing wage project. Upcharge applies per man per hour on top of published rates. DIR project number to appear on the dispatch tag and on the invoice.

Price allows for 10hrs on-site to rig in, work, and rig out. Price is based on non-holiday weekday work.

ITEMDESCRIPTIONPRICE
1Price includes up to 10hrs on-site to rig in, work, and rig out.$10,200.00
2Prevailing wage upcharge, 3 men, per DIR 2026-208317.$2,250.00
SUBTOTALCARB CHARGEGRAND TOTAL
$12,450.00$996.00$13,446.00
Bid
(Per scope of work)
Time & Materials Estimate
(Per scope of work)
Private Sector
Prevailing Wage
(Upcharge per man/hour per DIR)
EXCESS CREW TIME:
(If applicable)
YesNo# OF MEN:3
EST. MOB: Up to
(Included)
2Hrs.EST. DEMOB: Up to
(Included)
1Hrs.SUBSISTENCE:
(Per man per day plus motel)
$0.00

Standard Clarifications

  • Time on site beyond the quoted hours is billed at the applicable published rate(s) plus the 8% fuel-CARB surcharge.
  • Quote is subject to crane availability, weather, road and traffic control conditions.
  • Quote assumes clear, level access with firm ground and no overhead obstructions.
  • Credit card payments carry a 3.5% processing fee.
  • Where overnight stays are required, subsistence is charged at a reasonable per-day rate plus lodging.
  • Customer is responsible for the cost of any special insurance endorsements beyond our standard certificate.
  • Each party agrees to keep the other party’s pricing and planning information confidential and not to share it with third parties without prior consent.
  • Quote is valid for 14 days.
2180 Foundry Road, Pine Hollow, CA 95970WWW.SUMMITLIFT.EXAMPLE(916)-555-0100 / info@summitlift.example
Page 1 of 2
Summit Lift & Rigging, Inc. — Built to Lift
Quote
Quote #: 0413-26
(916)-555-0100 

Thank you for the opportunity to quote this work. We look forward to working with you. If you have any questions at all, please call or email me directly.

Marcus Hale
C: 916-555-0147
E: mhale@summitlift.example
Customer Name: Ironwood Bridge & Concrete
Customer Rep Name: Hector Salas
Customer Rep Signature:
Date:
PO#:

* Signature confirms acceptance of all applicable terms and conditions attached.

Certified operatorsFully insuredLift planning in-house24/7 dispatch
2180 Foundry Road, Pine Hollow, CA 95970WWW.SUMMITLIFT.EXAMPLE(916)-555-0100 / info@summitlift.example
Page 2 of 2